Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Viessmann Galeria Allendorf
Info

Between 1991 and 1993, the complex comprising the Galeria and the reception building, along with the “Via Temporis,” was constructed; together with the information and visitor center built in 2008, these buildings form the impressive entrance to the Viessmann company grounds in Allendorf.

The galeria with museum was planned as a glass, elevated structure and connects the information center with the reception building. Visitors first receive information about current heating-technology products, pass through the museum showing the company’s history and the work of Hans Viessmann, and can gain insights into the large production building via the so-called “Via Temporis.” The futuristic-looking building was constructed with an elliptical cross-section. The structural framework consists of two lattice-girder trusses connected at the nodes of the upper and lower chords.

The reception building is connected to the gallery by a transparent connecting structure, described as a “glass seam.” On three levels, there are training and meeting rooms as well as spaces for corporate management and sales. The façade is designed as a glass curtain wall with cantilevered escape and cleaning balconies in galvanized steel construction. The exterior sun protection was arranged at the level of the escape balconies.


Client
Viessmann Werke
GFA
reception building 1.674 sqm I Galeria 620 sqm I Via Temporis 490 sqm
Completed
1991-1993
Services
Objektplanung
Photography