ACTIVE B. Braun Melsungen
ACTIVE B. Braun Melsungen
ACTIVE B. Braun Melsungen
ACTIVE B. Braun Melsungen
ACTIVE B. Braun Melsungen
Info

The medical and pharmaceutical company B. Braun has commissioned the construction of a new production facility for disposable medical products for infusion therapy at its site in Melsungen. The building will have five floors and will connect to the existing production on Levels 3 and 4. A logistics area will be accommodated on levels 1 and 2, which will be served by the factory road. Sustainable concept: energy-efficient building technology, use of a wood chip power plant, photovoltaics, reduction of inner-city transport.

Client
B. Braun Melsungen AG
GFA
16.100 m²
Period of service
2018 till 2023
Services
Building planning in cooperation
with ORANGE BLU Stuttgart